Lecture Theatre Refurbishment 2001
The process involved in
refurbishing educational technology resources in a lecture theatre
is quite complex. As improvements in technology occur, outdated
equipment and cabling is required to be replaced with state of the
art technology. The
seven lecture theatres that are listed below in the 2001 works
program involved replacing older style Cathode Ray "3-gun" Sony
data projectors that were several years old and were uneconomical to
maintain with brand new "state of the
art" data projectors. The
replacement program also involved installing new "touch"
screen teaching lecterns that provide a greater depth of control
over the educational technology equipment and the teaching
environment within the particular lecture theatre. In the H2 theatre at the Clayton campus, a
Sanyo XP30 data projector was installed as this theatre is heavily used by the Visual
Culture Department from the Faculty of Arts. They require a data projector
that can show "movie" style images to their students
in a large seating capacity lecture theatre.
The new data projectors in
G43 (Berwick) and 5N104 (Gippsland) were installed to enhance
the Teleteaching environment. The majority of Teleteaching within the
University is conducted between the Berwick and Gippsland
campuses.
Please note that it can take a
minimum of 7 working days to upgrade or refurbish Teleteaching
lecture theatres.
2001 Works Program
Location |
Type |
Cable Installation |
Electronics Install |
Projector Type |
|---|
| Clayton H2 |
High Tech |
Completed |
Completed |
Sanyo GT1150 |
| Clayton H3 |
High Tech |
Completed |
Completed |
Lp 1000 |
| Clayton S5 |
High Tech |
Completed |
Completed |
Lp 920 |
| Clayton S7 |
High Tech |
Completed |
Completed |
Lp 920 |
| Peninsula F1 |
High Tech |
Completed |
Completed |
Lp 920 |
| Clayton E1 |
High Tech |
Completed |
Completed |
Lp 920 |
| Clayton E2 | High Tech |
Completed |
Completed |
Lp 920 |
| Clayton E3 | High Tech |
Completed |
Completed |
Lp 920 |
| Peninsula A4.41 |
High Tech |
Completed |
Completed |
ASK C100 |
| Peninsula D4.10 |
High Tech |
Completed |
Completed |
C100 |
| Peninsula A4.16 |
High Tech |
Completed |
Completed |
Lp1000 |
| Berwick 1.33 |
Teleteaching |
Completed |
Completed |
Lp920 x2 |
| Caulfield B2.13 |
Teleteaching |
Completed |
Completed |
Lp920 x2 |
| Berwick G43 |
Teleteaching |
Completed |
Completed |
Lp920 x2 |
| Gippsland 5N104 |
Teleteaching |
Completed |
Completed |
Lp920 x2 |
|